VincenTragosta - Tanya, Jawab, dan Belajar Tanpa Batas Logo

In Matematika / Sekolah Menengah Pertama | 2025-07-11

Jika 3 pekerja dapat menyelesaikan suatu pekerjaan dalam 12 hari, berapa hari yang diperlukan 6 pekerja untuk menyelesaikan pekerjaan yang sama?

Asked by SiJawabBnly2685

Answer (4)

the answer is 3. the number before the decimal is the whole number. if the number after the decimal is smaller than 4, round down and if the number after the decimal is greater than 5 then round up.

Answered by Jennyzhang | 2024-06-10

You look at 3.1 and you say to yourself . . .
"Self ! Look at that number. The next bigger whole number is 4, and the next smaller whole number is 3. Which one is nearer to 3.1 ? Did you say 3 is ? I'm so proud of you !"

Answered by AL2006 | 2024-06-10

To round 3.1 to the nearest whole number, look at the digit after the decimal, which is 1. Since 1 is less than 5, you round down, so the result is 3.
;

Answered by Jennyzhang | 2025-02-18

Diketahui3 pekerja menyelesaikan selama 12 hariDitanyaBerapa hari jika ada 6 pekerjaDijawab3 x 12 = 6 x c36 = 6cc = 36/6c = 6KesimpulanJawabannya 6 Hari.

Answered by aquila0152 | 2025-07-11